We are in the process of moving into Design Live, and I had a couple of questions.
1. In the traditional 2020, we ran into cross-compatibility issues — we have design teams that send files back and forth, so when we moved from 11 to 12, 12 could open files created in 11 but not in the reverse. If one member of the team moves to Live, will they still be able to open files from/send files to someone still in traditional 2020?
2. Right now, we use catalogs that are generated by our vendors and downloaded from their sites, and then uploaded into the 2020 catalog manager. If we switch over to Live, and the vendors are not ones that are utilizing cloud catalogs, do we still have to re-upload the catalogs one by one into the Live version as we did when we migrated from 11 to 12? Or is there a way to move them all over easily?
Thank you so much in advance for everyone’s input. The timing of this is a little tedious since we’re slammed right now, but before we all start doing it and there are problems, I want to have as much info as possible.
